Case Studies

Ashford Housing Project

This is a new build site of 5 houses. DDG have completed all enabling works, and groundworks from drainage and foundations to damp proof course level. We first went on site in summer 2022 and the project has an estimated timescale of 12 months. For regular updates on this project check out our social media.

Sittingbourne Extension of lorry bays

Cross and Wells is one of the leading packagers/ distributors for fruit and vegetables in England, due to their rapid growth they required an extension for each of the lorry bays in the building. A total of 9 lorry bays were extended, works consisted of installation of a 600m2 concrete base, deep drainage, excavation and […]

Dargate Industrial Units

With great access to the M2 off the A229 this industrial development of 48 brand new units offers businesses state of the art retail space which is both fully contained and logistically ideal. We have so far completed all the enabling works on site, done all the drainage, utilities and foundations. Ongoing works include installation […]

Wimbledon Tennis Club

After holding their first tournament in 1877, Wimbledon has grown into the most prestigious tennis tournament in the world. Bringing in over half a million people annually and with billions watching globally the grounds must be kept at world class standard. DDG have been working on Wimbledon since January 2023 and we are proud to […]

Deal Residential Project

The Deal Project consists of 35 houses across multiple phases. DDG Group are doing all aspects of groundworks from enabling to finishing. We originally mobilised in November 2022 and currently working on bases 1-5 which is at the front end of the site. For regular updates on this project check out our social media.

Cross & Wells, Sittingbourne

Extension of nine lorry bays, including detailed finishing works and large 600m2 concrete base, deep drainage, and construction of dock levellers.

Newhaven Ferry Port

Newhaven is one of the busiest ports in the country, which has been operating for near 2 centuries. Due to such high traffic the port is exposed to, they must regularly update certain areas. DDG completed electrofusion welding of main water connections across the port area, excavated and renewed trench works and kiosk bases and […]

Fulham Basement Project

This project was to create a basement under an existing property in Fulham, London. This was done by underpinning. The majority of the excavation was hand dug which was then removed with a conveyor belt and into a skip. For more information on this project check out our social media.

Elmhurst Holiday Park

In the heart of sheerness, Elmhurst Holiday Park is one of the largest mobile home sites in the country with over 300 units. DDG revamped and completed bases, roads and multiple other parts of the site. We also mass filled uneven grounds at the back of the site to make it easier assessable, refurbished the […]